Tuesday, January 19, 2010

Broken Chains Building Project

Goal: to be able to seat a minimum of 200 in the sanctuary

Phase 1:
Remove wall between the two kids room.
Install header to hide the difference in ceiling heights between
the two rooms.
Install door on storage closet inside kids room.
Install French style door in front foyer into kids room. Paint interior of new room.
Install carpet remnant in new room so that carpet is same color.

Phase 2:
Remove southside interior wall at rear if sanctuary.
Install south wall at new location.

Phase 3:
Remove northside interior wall at rear of sanctuary.
Install north wall at new location.
Move sound booth to new location.
Rewire sound booth.
Rewire electrical overhead lights and move master switch to
sound booth area for entire sanctuary.
Look at possibility of more spot lights for stage area.
Look at possibility of adding overhead screen in corner at an
angle.
Look at possibility of adding lights to outside sign.

Misc Phase:
Purchase at least 84 more chairs, giving us a total of 212 chairs.
Purchase remaining 19 tables for the price of 15. Do a study of
how many we need in sanctuary.
Purchase additional matchinf chairs for classrooms if funds permit.

Proposed start date: ASAP
Proposed finish date: April 1st,2010

Monday, January 4, 2010

Happy New Year Texans!!

Happy New Year!! We wish everyone a great New Year and as always continue to pray for the Lost and Hungry of Texas... God Bless

Our Strategy

The focus of the BGCT Church Starting Dept. is to Start healthy Churches based on 11 key components which are (in no certain order): 1)Core Group Development 2)Vision Development, 3)Church Type, 4)Evangelism, 5)Mentoring and Coaching, 6)Covenant Expectations and Doctrine Intergrity 7)Lay Leadership 8)Training and Development 9)Funding 10)Reproduction 11)Prayer and Spiritual Vitality